Howard County

US 29 (Columbia Pike) Northbound Widening Project – PHASE 2 (from the Middle Patuxent River Crossing to Seneca Drive)

2020.04.20  Phase-1 of this project widened northbound lanes of US 29 from South of Seneca Drive to South of Little Patuxent Parkway (MD 175).  This Phase-2 of the Project proposes to continue widening the northbound section of US 29 from South of Seneca Drive to the crossing over the Middle Patuxent River.  The planning phase for Phase-2 is complete, however, design, property acquisition and construction is pending allocation of additional funding.

Link to State’s project webpage: click here